EQUIPMENT INSTALLATION AT KHANCHEYSKOE FIELD IS UNDER WAY

Two Ural series gensets based on Aviadvigatel gas turbines will be put into operation at Khancheyskoe  oil and gas condensate field.

Each GPA-10 gas compressor package of DKS-06 booster compressor station produced by NPO Iskra OJSC is equipped with GTU-10P gas turbine drive made by Perm Engine Company OJSC,  245GC-2 compressor of Sumskoe NPO named after M.V.Frunze and ALGOSTAR automatic control system of Systema Gaz CJSC. General designer of the booster compressor station construction became YuzhNIIgiprogaz Institute OJSC, and the prime contractor was «Nadymgazstroydobycha» OJSC. Equipment is to be put into operation in 2009. A license for gas exploration and production at Khancheyskoe field opened in 1990 belongs to Novatek-Tarkosaleneftegas Ltd independent gas company. Khancheyskoe oil and gas condense field is located in Purovsky region of the Yamalo-Nenets Autonomous District.